Record the Pattern
Note whether problems follow rain, heavy use or a recent property change.
Locate the System
Find the permitted field, distribution equipment and replacement area.
Define the Investigation
Agree on excavation, camera work, equipment checks or flow testing.
Use the Findings
Separate a blocked connection from limited soil treatment before choosing repair or replacement.